SUBDIVISION DEVELOPMENT DEFINITIONS

APPLICATION TO AMEND AN EXISTING SUBDIVISION FINAL PLAT PHASE

A minor subdivision is a division of land into no more than nine lots. A minor subdivision shall not: include the construction of new infrastructure; be a part or a phase of a larger subdivision; be allowed further division of land by way of minor subdivision within three years of approval, further division within three years shall be accomplished through the standard subdivision process and shall include all land divided from the parcel in the last three years; and include commercial or industrial uses.

  1. MINOR SUBDIVISION APPLICATION

A standard subdivision is a division of land into no more than fifteen lots. A standard subdivision shall be processed in two phases 1) the concept/design phase and 2) the final plat phase. Infrastructure and public facilities may be dedicated. A standard subdivision shall be connected to a culinary water system in accordance with Tri-County Health Regulations. A standard subdivision shall be filed on a plat drawn and stamped by a licensed surveyor.

  1. CONCEPT/DESIGN PHASE APPLICATION
    DO NOT SUBMIT THE FINAL PLAT APPROVAL APPLICATION UNTIL THE Concept/design phase plat and infrastructure design and engineering drawings have been approved .
  2. FINAL PLAT PHASE APPLICATION

A major subdivision is a division of land into 16 to 99 lots. A major subdivision shall be phased for development. Infrastructure and public facilities may be dedicated. A major subdivision shall have a public water system serving all lots. A major subdivision shall have an (a) concept plan; (b) design phase; and (c) a final application process.

  1. CONCEPT/DESIGN PHASE APPROVAL APPLICATION
    DO NOT SUBMIT THE FOLLOWING APPLICATION UNTIL YOUR Concept phase plat and engineering drawings have been approved!
  2. DESIGN AND ENGINEERING APPROVAL APPLICATION
    DO NOT SUBMIT THE FOLLOWING APPLICATION UNTIL YOUR Design Phase Plat and Infrastructure Design and Engineering Drawings have been approved!
  3. FINAL PLAT PHASE APPROVAL APPLICATION

A PUD (Planned Unit Development) is
1) a division of land into 100 or more lots, 2) a master planned community developed under negotiated standards, or 3) a commercial or industrial development or land division.
A PUD shall be processed in three phases 1) the concept phase, 2) the design plat phase, and 3) the final plat phase. Infrastructure and public facilities may be dedicated.
A PUD subdivision shall be connected to a culinary water system in accordance with Tri-County Health Regulations. A PUD shall be filed on a plat drawn and stamped by a licensed surveyor. No single phase of a PUD may contain more than 25 lots.

  1. CONCEPT/DESIGN PHASE APPROVAL APPLICATION
    DO NOT SUBMIT THE FOLLOWING APPLICATION UNTIL YOUR Concept phase plat and engineering drawings have been approved!
  2. DESIGN AND ENGINEERING APPROVAL APPLICATION
    DO NOT SUBMIT THE FOLLOWING APPLICATION UNTIL YOUR Design Phase Plat and Infrastructure Design and Engineering Drawings have been approved!
  3. FINAL PLAT PHASE APPROVAL APPLICATION

 

 

 